Joeker said:Aiyoyo Samy (Sung like "London Bridge")
NKVE Bridge has fall down,
Fall down, fall down.
NKVE Bridge has fall down,
Aiyoyo Samy.
Take a gag and shut us up,
Shut us up, shut us up.
Take a gag and shut us up,
Aiyoyo Samy.
How will we build it up,
Build it up, build it up?
How will we build it up again,
Aiyoyo Samy?
Build it up with tax and toll,
Tax and toll, tax and toll.
Build it up with tax and toll,
Aiyoyo Samy.
Roads and bridges bend and break,
Bend and break, bend and break.
Roads and bridges bend and break,
Aiyoyo Samy.
Blame it on an Act of God,
Act of God, Act of God.
Blame it on an Act of God,
AIyoyo Samy.
Rocks and blames will wash away,
Wash away, wash away.
Rocks and blames will wash away,
AIyoyo Samy.
Joeker said:- The key Middle Ring Road in Kuala Lumpur closed after cracks found. Repairs cost RM18 million (S$7.8 million).
- Sultan Ismail Hospital in Johor Baru closed down because of a fungal outbreak due to faulty air-conditioning.
- A RM195 million building in Kuala Lumpur for the Malaysian External Trade Development Corporation was completed in 1997, but it could not be occupied because of structural problems. The contractor has been fined RM80 million.
- Landslide forced a three-month partial closure of the North-South Expressway at Gua Tempurung near Ipoh.
- The surface structure of the East Coast Expressway has been eroded and the hillslopes gave way on the new road to the Cameron Highlands in Pahang.
- Structural defects were found in 16 schools and community colleges, and 2,127 school computer laboratories had to be repaired at a cost of RM13 million.
- NKVE bridge collapsed.
What's next?
Joeker said:- The key Middle Ring Road in Kuala Lumpur closed after cracks found. Repairs cost RM18 million (S$7.8 million).
- Sultan Ismail Hospital in Johor Baru closed down because of a fungal outbreak due to faulty air-conditioning.
- A RM195 million building in Kuala Lumpur for the Malaysian External Trade Development Corporation was completed in 1997, but it could not be occupied because of structural problems. The contractor has been fined RM80 million.
- Landslide forced a three-month partial closure of the North-South Expressway at Gua Tempurung near Ipoh.
- The surface structure of the East Coast Expressway has been eroded and the hillslopes gave way on the new road to the Cameron Highlands in Pahang.
- Structural defects were found in 16 schools and community colleges, and 2,127 school computer laboratories had to be repaired at a cost of RM13 million.
- NKVE bridge collapsed.