I saw this from the web:
http://bolehlandconstruction.blogspot.com/2009/06/ldp-puchong-jaya-interchange-major.html
Content:
Owner/ Management: Lingkaran Trans Kota Sdn Bhd
Design, supervision, construction and commission: Gamuda
Problem: Crack lines at bridge soffit
Corrective action: To Conduct Condition Assessment on Bridges Located along Lebuhraya Damansara-Puchong by Evenfit Consult.
http://bolehlandconstruction.blogspot.com/2009/06/ldp-puchong-jaya-interchange-major.html
Content:
![Drawing1-Model.jpg](https://4.bp.blogspot.com/_agTCuCLTwXE/Sj66dNezrNI/AAAAAAAAAA0/rXOb1H3sE2M/s1600-h/Drawing1-Model.jpg)
Structure: Lebuhraya Damansara-Puchong, Puchong Jaya interchange (Exit 1114)
Affected: Puchong residents (335,419 population)Owner/ Management: Lingkaran Trans Kota Sdn Bhd
Design, supervision, construction and commission: Gamuda
Problem: Crack lines at bridge soffit
Corrective action: To Conduct Condition Assessment on Bridges Located along Lebuhraya Damansara-Puchong by Evenfit Consult.