Reply to thread

MRR2 bridge cracking is exceptional but im not sure why they said weather can affect bridge structure... it is either design failure, overload or contractor use the material is not up to engineers requirement. but why the engineers did not check during construction period? arguments here... zzzzzzzzz


i think they are building another bridge is because the second link is quite a distance from johor bahru or they planning to close down the existing bridge.


Posts refresh every 5 minutes




Search

Online now

Enjoying Zerotohundred?

Log-in for an ad-less experience