runner for sunroof installation..
kwl selia letter rm150 (2weeks process)
puspakom endorse rm150 (1day prcess)
endorse on geran rm50 owner must attend at any JPJ branch
all letter and resit from hafcut and installation wokshop needed for this application..
Hi folks, i'm going to slap on my 4G93T with nu turbo.
i've just got me a GT series A/R60 turbo. I was wondering bout how much power can i squeeze from it, any installation problems, spool time etc. Any help would...