runner for sunroof installation..
kwl selia letter rm150 (2weeks process)
puspakom endorse rm150 (1day prcess)
endorse on geran rm50 owner must attend at any JPJ branch
all letter and resit from hafcut and installation wokshop needed for this application..
does it hard to maintain one?how much does it cost per year to maintain?sry,i don know much,tats why open this thread to get more information.Might be getting one ...
i've changed my power steering fluid
the prob is the day i've change my power steering fluid, my steering runs smooth i the steering is very light
but after 1 week, my steering return to the previous condition that...
Does any of u saw this product b4? I m wondering if we can DIY this thing ourself. The injector is assemble to inlet manifold through an air intake tube. Sorry could find any picture of this thing.